Wednesday, July 29, 2009

Data Flow Diagram (DFD)

The next task which is Data Flow Diagram (DFD) also done. Thanks again all the team member for their idea and time. The file is available for download at the following link:

Data Flow Diagram (DFD)

Prepared by: Quek Wei Chun (Document Manager)
Teh Kok Hou (Programmer)
Yeoh Tih Huang (Programming Leader)
Edited by: Chow Yen Cheng (Team Leader)
Checked by: Tan Joo Bing (Design Manager)

Entity Relationship Diagram (ERD)

The next task which is the Entity Relationship Diagram (ERD) for our assignment is also done. Thanks to the idea and time of all our teammate. The file is available for download at the link below:

Entity Relationship Diagram (ERD)


Prepared by: Quek Wei Chun (Document Manager)
Teh Kok Hou (Programmer)
Yeoh Tih Huang (Programming Leader)
Edited by: Chow Yen Cheng (Team Leader)
Checked by: Tan Joo Bing (Design Manager)

UML activity diagram

After much delay, the UML activity diagram has done. Thanks to the idea of all the teammate.
The link to the activity diagram is at below:

UML activity diagram

Prepared by: Quek Wei Chun (Document Manager)
Teh Kok Hou (Programmer)
Yeoh Tih Huang (Programming Leader)
Edited by: Chow Yen Cheng (Team Leader)
Checked by: Tan Joo Bing (Design Manager)

Monday, July 20, 2009

UML use case diagram

The UML use case diagram for our online shopping store is done. the download link will be available below

Prepared by: Tan Joo Bing (Design Manager)
Edited by: Chow Yen Cheng (Team Leader)
Checked by: Quek Wei Chun (Document Manager)

UML use case diagram

Monday, July 13, 2009

Website Design Criterion in detail

Finally all the design criterion of our online shopping website in detail and decided, thanks to the idea and time of all our teammate. the file is available at the link below

Design Criterion

Project Lifecycle Model

After discussion with all the teammate for this week task, we have decided and come out with the project lifecycle for our online shopping website. The file is available at the link below

Project lifecycle

Saturday, July 11, 2009

Revised Gantt chart

After consulting to the lecturer about the Gantt Chart, we have revised and come out with the final version of Gantt chart for our project, the chart has been edited by document manager, Quek Wei Chun. The link is provided below

Prepared by : Chow Yen Cheng (Team Leader)
Edited by : Quek Wei Chun (Document Manager)
Checked by : Yeoh Tih Huang (Programmer)

Planning Requirement
Work Breakdown Structure
Gantt Chart

Monday, July 6, 2009

Gantt Chart

To complete this week milestone, all of us group together to discuss the event that we initially plan before the start of this project about the project time duration, project event itself, and ultimately the preparation of the gantt chart. Thanks to group leader that put together the discussion result. The planning requirement, work breakdown structure and Gantt chart is available at the following link respectively.

Prepared by : Chow Yen Cheng (Team Leader)
Edited by : Quek Wei Chun (Document Manager)
Checked by : Teh Kok Hou (Programmer)

Plan Requirement
Work Breakdown Structure
Gantt Chart

Thursday, July 2, 2009

Draft Website Layout

After several discussion with all the teammate, a draft of the layout of our own shopping website is created, a detail of everything will be further improve by our design manager Tan Joo Bin. The draft is available at the following link.

Prepared by: Yeoh Tih Huang (Programmer)
Edited by : Teh Kok Hou (Programmer)
Checked by: Tan Joo Bing (Design Manager)

Draft Website Layout